Search Jobs

Hold CTRL to choose multiple sectors (up to 3)


Hold CTRL to choose multiple sectors (up to 3)

Claims Manager - HVAC- chernobyl job in Chernobyl

  • Show me jobs like this one
  • More jobs from this recruiter
  • Email this job to a friend
  • Print this job
Job Ref:  204547210
Employer:  cv-library.co.uk
Industry:  Construction
Job Type:  Contract
Country:  United Kingdom
County/State:  -
City:  Chernobyl
10/10/2016 18:30
NSC Project Brief

Job Title:
Claims Manager - New Safe Confinement (NSC) Heating & Ventilation System

Novarka (JV between Bouygues Construction & Vinci Grand Projects)

Slavutych, Ukraine

Scope of works:

The Project scope of works is the supply, and fabrication of ductwork and procurement related to the containment ventilation for the Project to be delivered on an Ex Works basis; followed by the supervision of installation labour provided by the client. Thereafter, our client shall be conducting the commissioning of the ventilation works on site in order to provide containment in such a way that the air flow will always be directed from the low contamination areas to the high contamination areas and to maintain levels of release to within the agreed limits. Our client will supply the ductwork systems whilst the precise nature of who supplies the plant is still under discussion. Our client will be providing a variety of staff into the project to consist of project manager and engineer, senior and assistant quantity surveyors, and quality engineers. Procurement managers, design engineers, drafting resource, site construction & installation managers and a commissioning manager

Project Structure:

The client in this matter is Novarka, an un-incorporated Joint Venture between Vinci Grand Projects (VCGP) and Bouygues Travaux Publics (BYTP), both are French Registered entities. The Project involves input from VCGP and BYTP in their own capacity together with a third party NOVI; and they wish for our client to work with them within the framework of a Joint Venture. Therefore we have proposed that we adopt a traditional form of contracting, in that our client is appointed by Novarka for the Project and that our client in turn appoint NOVI, VCGP and BYTP as its suppliers.


The majority of the client workforce will reside and work in the town of Slavutych, which is some 50kms from Chernobyl. Slavutych was specifically built to house workers from the Chernobyl plant and is where the headquarters of Novarka are based. A rail line links Slavutych to Chernobyl, which runs through Belarus.

Further information

Recommended web site is:
GOOGLE wiki/Chernobyl_New_Safe_Confinement

NSC Project at Chernobyl Reactor 4 site

New Safe Confinement (NSC or New Shelter) is a structure intended to contain the nuclear reactor at Chernobyl

This is a Joint Venture (JV) - Our Client and Bouygues Construction (French based) for Novarka (client) which is French company, so HR is vital , they work has a team so it's a job were collaborative working is important.
Project base is Slavutych is a city in northern Ukraine, purposely built for the evacuated personnel of the Chernobyl Nuclear Power Plant after the 1986 disaster that occurred in the city of Pripyat. Which is approx. 50km from Chernobyl, access to site is by train or car through Belarus

FIDIC contract

Nuclear site with radiological conditions:
English speaking project but French or Russian speaking would be advantage although we will have translators employed by JV
NOVARKA will provide:

Plane tickets (2 ways) based on 6 travels per year including transport to airport, for 1 weeks break at a time with 2 weeks break at Christmas (only time the site shuts)

Accommodations in Ukraine, (Slavutych)

Living allowance in UAH money very inexpensive to live
Office in Slavutich and ChNPP

site Canteen for lunch time

All transports and logistic between, office, flat, hotel, ChNPP

Legal documents (Visa, residence permit)

French school in Slavutych
Copyright © Rengineeringjobs.com Job Board 2011  | Powered by JobMount Job Board Software